In October 2013 Deploy Subsea were awarded a contract with Fulton Hogan Services to provide all dive support during the remediation works on Br1228 Ravenswood. The scope of work was to install 13 pile pots and included cutting of timber piles approx 300mm below water line and then fix cross bracing to pile at approx 1.2m below water line, then bottom and side forms and seal for dewatering. Once the internal pile formwork and steel piles were installed they were then reinforced with concrete. Deploy also conducted Waler modifications filling the old bolt holes with a grout.